HutsGo

Japan › Northern Japan Alps

1 nights / 2 days / approx. 9.1 km / High point 1,500m

Dakesawa from Kamikochi

Kamikochi → Kamikochi → Kamikochi

From Kamikochi up the Dakesawa valley to Dakesawa Goya, under the Hotaka walls.

How hard is it?

Typical
1 nights / 2 days
Walking time
approx. 6h10estimated from distance, climb and descent; no breaks
Distance
approx. 9.1 km
Total climb
approx. 880m high point Kamikochi 1,500m

This route is not in a prefectural grading table.

How do I get there?

Reachable by Bus.
Back to the same trailhead. Private cars restricted

  1. Sawando or Hirayu 沢渡・平湯
  2. Kamikochi 1,500m / Restricted (park and change)
  3. Kamikochi Back to the same trailhead

Last ride down 17:55 Matsumoto / Shinshimashima to Kamikochi (松本・新島々〜上高地)

Times, fares and parking →

When are the huts open?

Open today (10/23): 1 of 1 huts

2026 season dates, from each hut's official site and Nagano Prefecture's hut list (sources on each hut page).

When does booking open?

1 huts to stay at. Book with each hut (HutsGo takes no bookings).

Pick your huts and plan the days

Map and elevation

Elevation profile of Dakesawa from Kamikochi. Horizontal axis is cumulative walking time, vertical axis is elevation.1,500mKamikochi (上高地) · 1,500m · 0 min from the start · TrailheadKamikochi 1,500mDakesawa-goya (岳沢小屋) · Elevation not confirmed · 0 min from the start · Hut (tap for details)Dakesawa-goya Not confirmedKamikochi (上高地) · 1,500m · 0 min from the start · TrailheadKamikochi 1,500m Elevation profile of Dakesawa from Kamikochi. Horizontal axis is cumulative walking time, vertical axis is elevation.1,500mKamikochi (上高地) · 1,500m · 0 min from the start · TrailheadKamikochiDakesawa-goya (岳沢小屋) · Elevation not confirmed · 0 min from the start · Hut (tap for details)Dakesawa-goya Not confirmedKamikochi (上高地) · 1,500m · 0 min from the start · TrailheadKamikochi

High point 1,500m / Total ascent approx. 0m / 0m of climbing from Kamikochi (1,500m)

Hut (tap for details) Trailhead Point passed Elevation not confirmed

The horizontal axis is the order of the route, not time: we have not confirmed this route's leg times against an official source. The ridge line simply joins the recorded points, so it does not show the real shape of the terrain. Total ascent is an approximation summed between those points. Dakesawa-goya have no confirmed elevation, so they are placed provisionally between the points either side.

Dakesawa wetland and the Hotaka peaks, Kamikochi
Dakesawa wetland and the Hotaka peaks, Kamikochi Photo: lumoplank / CC0(Wikimedia Commons)
Shows whether each hut is open that day

Stop by stop

Section times are estimates from the path length, climb and descent (a formula fitted to Nagano Prefecture's grading table; typically within about 10%).

  1. 1,500m

    Kamikochi (上高地)Trailhead

    Closed to private cars all year. Bus or taxi from Sawando or Hirayu.

  2. approx. 3h10 up 847m down 40m
  3. Elevation not confirmed

    Dakesawa-goya (岳沢小屋)Mountain hut / Yarigatake Sanso Group

    27 Apr – 3 Nov Confirmed on the official site (2026-09-13)

    Dinner + breakfast ¥16,000 No meals ¥11,200 Tent ¥2,000

    • Toilet: Cartridge (flown out)
    • Water: Free
    • Charging available

    Booking opensOne month before your stay, 09:00 JST

  4. approx. 3h up 35m down 851m
  5. 1,500m

    Kamikochi (上高地)Trailhead

    Closed to private cars all year. Bus or taxi from Sawando or Hirayu.