1 nights / 2 days / approx. 16.6 km / High point 3,776m
Mount Fuji by the Yoshida trail
Fuji Subaru Line 5th Station → Mount Fuji (Kengamine) → Fuji Subaru Line 5th Station
From the Fuji Subaru Line 5th Station up the Yoshida trail to a hut around the 8th station, then on to the summit, round the crater rim past Kengamine (3,776 m), and back down the descent trail.
How hard is it?
- Typical
- 1 nights / 2 days
- Walking time
- approx. 11h25estimated from distance, climb and descent; no breaks
- Distance
- approx. 16.6 km
- Total climb
- approx. 1,650m high point Mount Fuji (Kengamine) 3,776m
This route is not in a prefectural grading table.
How do I get there?
Public transport not confirmed.
Back to the same trailhead
- Fuji Subaru Line 5th Station 2,303m
- 1 nights / 2 days, out and back
- Fuji Subaru Line 5th Station Back to the same trailhead
When are the huts open?
None of the 14 huts is open today (10/23)
- Satomidaira Seikanso Not confirmed Not confirmed
- Hanagoya Not confirmed Not confirmed
- Hinodekan Not confirmed Not confirmed
- Tomoekan (7th station) Not confirmed Not confirmed
- Kamaiwakan Not confirmed Not confirmed
- Fuji Ichikan Not confirmed Not confirmed
- Toriiso Not confirmed Not confirmed
- Toyokan 30 Jun – 10 Sep
- Taishikan 30 Jun – 9 Sep
- Horaikan Not confirmed Not confirmed
- Hakuunso 1 Jul – 10 Sep
- Gansomuro Not confirmed Not confirmed
- Fujisan Hotel (Hon-8th station) Not confirmed Not confirmed
- Tomoekan (Hon-8th station) Not confirmed Not confirmed
2026 season dates, from each hut's official site and Nagano Prefecture's hut list (sources on each hut page).
When does booking open?
14 huts to stay at. Book with each hut (HutsGo takes no bookings).
- Satomidaira Seikanso Not confirmed
- Hanagoya Not confirmed
- Hinodekan Not confirmed
- Tomoekan (7th station) Not confirmed
- Kamaiwakan Not confirmed
- Fuji Ichikan Not confirmed
8 more in the list below
Pick your huts and plan the daysMap and elevation
Times are estimates from distance and climb (no breaks)
The line follows the GSI map footpaths. Trust the signposts on the day. Save GPX
High point 3,776m / Total ascent approx. 1,473m / 1,473m of climbing from Fuji Subaru Line 5th Station (2,303m)
Hut (tap for details) Trailhead Point passed Elevation not confirmed
The horizontal axis is the order of the route, not time: we have not confirmed this route's leg times against an official source. The ridge line simply joins the recorded points, so it does not show the real shape of the terrain. Total ascent is an approximation summed between those points. Satomidaira Seikanso, Hanagoya, Fuji Ichikan, Hakuunso, Gansomuro have no confirmed elevation, so they are placed provisionally between the points either side.


Stop by stop
Section times are estimates from the path length, climb and descent (a formula fitted to Nagano Prefecture's grading table; typically within about 10%).
- — Height change not confirmed
-
Elevation not confirmed
Satomidaira Seikanso (里見平★星観荘)Mountain hut
Opening dates not confirmed Not confirmed
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
- — Height change not confirmed
-
Elevation not confirmed
Hanagoya (花小屋)Mountain hut
Opening dates not confirmed Not confirmed
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
- — Height change not confirmed
-
2,720m
Hinodekan (日の出館)Mountain hut
Opening dates not confirmed Not confirmed
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
- approx. 5 min up 21m
-
2,740m
Tomoekan (7th station) (七合目トモエ館)Mountain hut
Opening dates not confirmed Not confirmed
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
- approx. 10 min up 50m
-
2,790m
Kamaiwakan (鎌岩館)Mountain hut
Opening dates not confirmed Not confirmed
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
- — Height change not confirmed
-
Elevation not confirmed
Fuji Ichikan (富士一館)Mountain hut
Opening dates not confirmed Not confirmed
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
- — Height change not confirmed
-
2,900m
Toriiso (鳥居荘)Mountain hut
Opening dates not confirmed Not confirmed
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
- approx. 15 min up 92m
-
3,000m
Toyokan (東洋館)Mountain hut
30 Jun – 10 Sep Secondary source (as of 2026-10-07)
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
Booking opensオンライン予約(公式サイトから)
- approx. 15 min up 95m
-
3,100m
Taishikan (太子舘)Mountain hut
30 Jun – 9 Sep Secondary source (as of 2026-10-07)
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
Booking opensBookings open by stay date: 30 Jun–15 Jul from 11 May 09:00, 16–31 Jul from 12 May, 1–15 Aug from 13 May, 16 Aug–9 Sep from 14 May (online only).
- approx. 10 min up 51m
-
3,150m
Horaikan (蓬莱館)Mountain hut
Opening dates not confirmed Not confirmed
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
- approx. 20 min up 96m down 16m
-
Elevation not confirmed
Hakuunso (白雲荘)Mountain hut
1 Jul – 10 Sep 公式の表記は「7月1日〜9月10日を予定」 Secondary source (as of 2026-10-07)
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
Booking opensFrom 1 May, 09:30 JST (online only; no phone bookings).
- — Height change not confirmed
-
Elevation not confirmed
Gansomuro (元祖室)Mountain hut
Opening dates not confirmed Not confirmed
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
- — Height change not confirmed
-
3,400m
Fujisan Hotel (Hon-8th station) (本八合目 富士山ホテル)Mountain hut
Opening dates not confirmed Not confirmed
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
- — Height change not confirmed
-
3,400m
Tomoekan (Hon-8th station) (本八合目トモエ館)Mountain hut
Opening dates not confirmed Not confirmed
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
- approx. 7h25 up 495m down 1,590m via Mount Fuji (Kengamine) 3,776m