Day trip / approx. 10.2 km / High point 2,760m
Iodake from Sakuradaira
Sakuradaira → Iodake → Sakuradaira
From Sakuradaira (1,890 m) via Natsuzawa pass to Iodake (2,760 m) on the rim of an explosion crater, and back.
How hard is it?
Easy.
Walkable path
Stamina 3 / 10Walking 4h24
“A day trip is possible”
Technical B
Steep ups and downs; hiking experience needed
- Typical
- Day trip
- Walking time
- 4h24walking only, no breaks
- Distance
- approx. 10.2 km
- Total climb
- approx. 940m high point Iodake 2,760m
Stamina and technical grades: Nagano Prefecture mountain grading, No.77 (our translation). HutsGo is still checking these against the table. See the table
How do I get there?
Public transport not confirmed.
Back to the same trailhead
- Sakuradaira 1,890m / Parking for about 150 cars
- Day trip, out and back
- Sakuradaira Back to the same trailhead
By car Free (about 150 cars). No bus; take a taxi from Chino Station.
Times, fares and parking →When are the huts open?
Open today (10/23): 2 of 2 huts
- Natsuzawa Kosen Open all year
- Oren-goya 25 Apr – 1 Nov
2026 season dates, from each hut's official site and Nagano Prefecture's hut list (sources on each hut page).
When does booking open?
2 huts to stay at. Book with each hut (HutsGo takes no bookings).
- Natsuzawa Kosen Not confirmed
- Oren-goya Not confirmed
Map and elevation
Times split the official prefectural total (no breaks)
The line follows the GSI map footpaths. Trust the signposts on the day. Save GPX
High point 2,760m / Total ascent approx. 870m / 870m of climbing from Sakuradaira (1,890m)
Hut (tap for details) Trailhead Point passed Elevation not confirmed
The horizontal axis is the order of the route, not time: we have not confirmed this route's leg times against an official source. The ridge line simply joins the recorded points, so it does not show the real shape of the terrain. Total ascent is an approximation summed between those points.


Stop by stop
Section times split the prefecture's official total course time across sections by path length, climb and descent.
- approx. 35 min up 192m down 16m
-
2,060m
Natsuzawa Kosen (夏沢鉱泉)Hot spring inn
Open all year Secondary source (as of 2026-10-13)
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
- approx. 40 min up 260m down 7m
-
2,330m
Oren-goya (オーレン小屋)Mountain hut
25 Apr – 1 Nov Secondary source (as of 2026-10-13)
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
- approx. 2h up 458m down 464m via Iodake 2,760m
-
2,330m
Oren-goya (オーレン小屋) again on the way back ↑ details
- approx. 40 min up 5m down 265m
-
2,060m
Natsuzawa Kosen (夏沢鉱泉) again on the way back ↑ details
- approx. 30 min up 13m down 188m