1 nights / 2 days / approx. 12.4 km / High point 2,670m
Jiigatake from Ogizawa (Jiigatake trailhead)
Ogizawa (Jiigatake trailhead) → Jiigatake → Ogizawa (Jiigatake trailhead)
From Ogizawa (Jiigatake trailhead) (1,338 m) up to Jiigatake (2,670 m) and back the same way.
How hard is it?
Moderate.
Walkable path
Stamina 4 / 10Walking 8h18
“1 night or more is advisable”
Technical B
Steep ups and downs; hiking experience needed
- Typical
- 1 nights / 2 days
- Walking time
- 8h18walking only, no breaks
- Distance
- approx. 12.4 km
- Total climb
- approx. 1,570m high point Jiigatake 2,670m
Stamina and technical grades: Nagano Prefecture mountain grading, No.20 (our translation). HutsGo is still checking these against the table. See the table
How do I get there?
Public transport not confirmed.
Back to the same trailhead
- Ogizawa (Jiigatake trailhead) 1,338m
- 1 nights / 2 days, out and back
- Ogizawa (Jiigatake trailhead) Back to the same trailhead
When are the huts open?
None of the 1 huts is open today (10/23)
- Taneike Sanso 1 Jul – 17 Oct
2026 season dates, from each hut's official site and Nagano Prefecture's hut list (sources on each hut page).
When does booking open?
1 huts to stay at. Book with each hut (HutsGo takes no bookings).
- Taneike Sanso Not confirmed
Map and elevation
Times split the official prefectural total (no breaks)
The line follows the GSI map footpaths. Trust the signposts on the day. Save GPX
High point 2,670m / Total ascent approx. 1,332m / 1,332m of climbing from Ogizawa (Jiigatake trailhead) (1,338m)
Hut (tap for details) Trailhead Point passed Elevation not confirmed
The horizontal axis is the order of the route, not time: we have not confirmed this route's leg times against an official source. The ridge line simply joins the recorded points, so it does not show the real shape of the terrain. Total ascent is an approximation summed between those points.

Stop by stop
Section times split the prefecture's official total course time across sections by path length, climb and descent.
- approx. 3h25 up 1,153m down 36m
-
2,450m
Taneike Sanso (種池山荘)Mountain hut
1 Jul – 17 Oct Booking required for every stay Secondary source (as of 2026-10-13)
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
- approx. 1h45 up 281m down 285m via Jiigatake 2,670m
-
2,450m
Taneike Sanso (種池山荘) again on the way back ↑ details
- approx. 3h10 up 38m down 1,157m