HutsGo

Japan › Tohoku

Day trip / approx. 7.4 km / High point 1,626m

Kurikomayama from Sukawa Onsen

Sukawa Onsen → Kurikomayama → Sukawa Onsen

From Sukawa Onsen (1,114 m) up to Kurikomayama (1,626 m) and back the same way. Part of the Sukawa trail was closed because of volcanic gas and reopened on 18 July 2026 (Iwate Prefecture).

How hard is it?

Easy.
Walkable path

Stamina 3 / 10Walking approx. 4h10

“A day trip is possible”

Technical B

Steep ups and downs; hiking experience needed

Typical
Day trip
Walking time
approx. 4h10estimated from distance, climb and descent; no breaks
Distance
approx. 7.4 km
Total climb
approx. 520m high point Kurikomayama 1,626m

Stamina and technical grades: Akita Prefecture mountain grading, No.33 (our translation). Figures are for a similar route. HutsGo is still checking these against the table. See the table

How do I get there?

Public transport not confirmed.
Back to the same trailhead

  1. Sukawa Onsen 1,114m
  2. Sukawa Onsen Back to the same trailhead
Times, fares and parking →

Do I need to book?

A day route: no hut booking needed.

Map and elevation

Elevation profile of Kurikomayama from Sukawa Onsen. Horizontal axis is cumulative walking time, vertical axis is elevation.1,0001,500mSukawa Onsen (須川温泉) · 1,114m · 0 min from the start · TrailheadSukawa Onsen 1,114mKurikomayama (栗駒山) · 1,626m · 0 min from the start · Point passedKurikomayama 1,626mSukawa Onsen (須川温泉) · 1,114m · 0 min from the start · TrailheadSukawa Onsen 1,114m Elevation profile of Kurikomayama from Sukawa Onsen. Horizontal axis is cumulative walking time, vertical axis is elevation.1,0001,500mSukawa Onsen (須川温泉) · 1,114m · 0 min from the start · TrailheadSukawa OnsenKurikomayama (栗駒山) · 1,626m · 0 min from the start · Point passedKurikomayamaSukawa Onsen (須川温泉) · 1,114m · 0 min from the start · TrailheadSukawa Onsen

High point 1,626m / Total ascent approx. 512m / 512m of climbing from Sukawa Onsen (1,114m)

Hut (tap for details) Trailhead Point passed Elevation not confirmed

The horizontal axis is the order of the route, not time: we have not confirmed this route's leg times against an official source. The ridge line simply joins the recorded points, so it does not show the real shape of the terrain. Total ascent is an approximation summed between those points.

Kurikomayama
Kurikomayama Photo: lumoplank / CC0(Wikimedia Commons)
Kurikomayama in autumn
Kurikomayama in autumn Photo: Raita Futo / CC BY 2.0(Wikimedia Commons)
Shows whether each hut is open that day

Stop by stop

Section times are estimates from the path length, climb and descent (a formula fitted to Nagano Prefecture's grading table; typically within about 10%).

  1. approx. 4h10 up 524m down 526m via Kurikomayama 1,626m