1 nights / 2 days / approx. 13.5 km / High point 2,932m
Shiroumadake from Sarukura
Sarukura → Shiroumadake → Sarukura
From Sarukura (1,242 m) up to Shiroumadake (2,932 m) and back the same way.
How hard is it?
Moderate.
Ladders and chains
Stamina 4 / 10Walking 9h48
“1 night or more is advisable”
Technical C
Ladders and chains; a slip can mean a fall
- Typical
- 1 nights / 2 days
- Walking time
- 9h48walking only, no breaks
- Distance
- approx. 13.5 km
- Total climb
- approx. 1,720m high point Shiroumadake 2,932m
Stamina and technical grades: Nagano Prefecture mountain grading, No.24 (our translation). HutsGo is still checking these against the table. See the table
How do I get there?
Public transport not confirmed.
Back to the same trailhead
When are the huts open?
None of the 3 huts is open today (10/23)
- Sarukura-so 27 Jun – 26 Sep
- Hakubadake Chojo Shukusha 27 Jun – 27 Sep
- Hakuba Sanso 25 Apr – 12 Oct
2026 season dates, from each hut's official site and Nagano Prefecture's hut list (sources on each hut page).
When does booking open?
3 huts to stay at. Book with each hut (HutsGo takes no bookings).
- Sarukura-so Web bookings open 20 May, 07:00 JST / unofficial
- Hakubadake Chojo Shukusha Bookings open 8 May, 09:00 JST / unofficial
- Hakuba Sanso Summer season (from 20 Jun): web bookin… / unofficial
Map and elevation
Times split the official prefectural total (no breaks)
The line follows the GSI map footpaths. Trust the signposts on the day. Save GPX
High point 2,932m / Total ascent approx. 1,690m / 1,690m of climbing from Sarukura (1,242m)
Hut (tap for details) Trailhead Point passed Elevation not confirmed
The horizontal axis is the order of the route, not time: we have not confirmed this route's leg times against an official source. The ridge line simply joins the recorded points, so it does not show the real shape of the terrain. Total ascent is an approximation summed between those points.

Stop by stop
Section times split the prefecture's official total course time across sections by path length, climb and descent.
- — up 6m
-
1,250m
Sarukura-so (猿倉荘)Mountain hut
27 Jun – 26 Sep Secondary source (as of 2026-10-13)
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
Booking opensWeb bookings open 20 May, 07:00 JST
- approx. 4h25 up 1,488m down 6m
-
2,730m
Hakubadake Chojo Shukusha (村営白馬岳頂上宿舎)Mountain hut
27 Jun – 27 Sep Secondary source (as of 2026-10-13)
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
Booking opensBookings open 8 May, 09:00 JST
- approx. 20 min up 105m
-
2,832m
Hakuba Sanso (白馬山荘)Mountain hut
25 Apr – 12 Oct Secondary source (as of 2026-10-13)
Prices not confirmed
Facilities (toilet, water, charging, payment) not confirmed
Booking opensSummer season (from 20 Jun): web bookings open 20 May, 07:00 JST
- approx. 35 min up 97m down 96m via Shiroumadake 2,932m
-
2,832m
Hakuba Sanso (白馬山荘) again on the way back ↑ details
- approx. 20 min up 6m down 111m
-
2,730m
Hakubadake Chojo Shukusha (村営白馬岳頂上宿舎) again on the way back ↑ details
- approx. 4h05 up 6m down 1,487m
-
1,250m
Sarukura-so (猿倉荘) again on the way back ↑ details
- — down 6m