HutsGo

Japan › Yatsugatake

Day trip / approx. 9.8 km / High point 2,646m

Tengudake from Shibu-no-yu

Shibu-no-yu → Nishi-Tengudake → Shibu-no-yu

From Shibu-no-yu (1,840 m) up over Higashi-Tengu to Nishi-Tengu (2,646 m), and back.

How hard is it?

Easy.
Walkable path

Stamina 3 / 10Walking approx. 6h25

“A day trip is possible”

Technical B

Steep ups and downs; hiking experience needed

Typical
Day trip
Walking time
approx. 6h25estimated from distance, climb and descent; no breaks
Distance
approx. 9.8 km
Total climb
approx. 890m high point Nishi-Tengudake 2,646m

Stamina and technical grades: Nagano Prefecture mountain grading, No.88 (our translation). Figures are for a similar route. HutsGo is still checking these against the table. See the table

How do I get there?

Reachable by Bus.
Back to the same trailhead

  1. Chino Station (Okutateshina Shibu-no-yu line)
  2. Shibu-no-yu 1,840m
  3. Shibu-no-yu Back to the same trailhead
Times, fares and parking →

When are the huts open?

Open today (10/23): 1 of 1 huts

2026 season dates, from each hut's official site and Nagano Prefecture's hut list (sources on each hut page).

When does booking open?

1 huts to stay at. Book with each hut (HutsGo takes no bookings).

Pick your huts and plan the days

Map and elevation

Elevation profile of Tengudake from Shibu-no-yu. Horizontal axis is cumulative walking time, vertical axis is elevation.2,0002,500mShibu-no-yu (渋の湯) · 1,840m · 0 min from the start · TrailheadShibu-no-yu 1,840mKuroyuri Hutte (黒百合ヒュッテ) · 2,400m · 0 min from the start · Hut (tap for details)Kuroyuri Hutte 2,400mNishi-Tengudake (西天狗岳) · 2,646m · 0 min from the start · Point passedNishi-Tengudake 2,646mKuroyuri Hutte (黒百合ヒュッテ) · 2,400m · 0 min from the startKuroyuri Hutte 2,400mShibu-no-yu (渋の湯) · 1,840m · 0 min from the start · TrailheadShibu-no-yu 1,840m Elevation profile of Tengudake from Shibu-no-yu. Horizontal axis is cumulative walking time, vertical axis is elevation.2,0002,500mShibu-no-yu (渋の湯) · 1,840m · 0 min from the start · TrailheadShibu-no-yuKuroyuri Hutte (黒百合ヒュッテ) · 2,400m · 0 min from the start · Hut (tap for details)Kuroyuri HutteNishi-Tengudake (西天狗岳) · 2,646m · 0 min from the start · Point passedNishi-TengudakeKuroyuri Hutte (黒百合ヒュッテ) · 2,400m · 0 min from the startKuroyuri HutteShibu-no-yu (渋の湯) · 1,840m · 0 min from the start · TrailheadShibu-no-yu

High point 2,646m / Total ascent approx. 806m / 806m of climbing from Shibu-no-yu (1,840m)

Hut (tap for details) Trailhead Point passed Elevation not confirmed

The horizontal axis is the order of the route, not time: we have not confirmed this route's leg times against an official source. The ridge line simply joins the recorded points, so it does not show the real shape of the terrain. Total ascent is an approximation summed between those points.

Tengudake from Iodake
Tengudake from Iodake Photo: Σ64 / CC BY 3.0(Wikimedia Commons)
Nishi-Tengudake
Nishi-Tengudake Photo: Σ64 / CC BY 3.0(Wikimedia Commons)
Shows whether each hut is open that day

Stop by stop

Section times are estimates from the path length, climb and descent (a formula fitted to Nagano Prefecture's grading table; typically within about 10%).

  1. approx. 2h05 up 543m down 5m
  2. 2,400m

    Kuroyuri Hutte (黒百合ヒュッテ)Mountain hut

    Open all year Booking required for every stay Secondary source (as of 2026-10-13)

    Prices not confirmed

    Facilities (toilet, water, charging, payment) not confirmed

  3. approx. 2h25 up 341m down 344m via Nishi-Tengudake 2,646m
  4. approx. 1h55 up 7m down 548m