1 nights / 2 days / approx. 11.2 km / High point 2,763m
Tsubakurodake from Nakabusa Onsen
Nakabusa Onsen trailhead → Tsubakurodake → Nakabusa Onsen trailhead
Up the Kassen ridge from Nakabusa Onsen to Enzanso, then out and back to the Tsubakurodake summit.
How hard is it?
Moderate.
Walkable path
Stamina 4 / 10Walking 7h48
“1 night or more is advisable”
Technical B
Steep ups and downs; hiking experience needed
- Typical
- 1 nights / 2 days
- Walking time
- 7h48walking only, no breaks
- Distance
- approx. 11.2 km
- Total climb
- approx. 1,420m high point Tsubakurodake 2,763m
Stamina and technical grades: Nagano Prefecture mountain grading, No.31 (our translation). HutsGo is still checking these against the table. See the table
How do I get there?
Reachable by Bus.
Back to the same trailhead
- Hotaka Station 穂高駅
- Bus
- Nakabusa Onsen trailhead 1,462m
- 1 nights / 2 days, out and back
- Nakabusa Onsen trailhead Back to the same trailhead
By car Three car parks. Full from early morning in peak season.
Times, fares and parking →When are the huts open?
Open today (10/23): 1 of 1 huts
- Enzanso 25 Apr – 22 Nov
2026 season dates, from each hut's official site and Nagano Prefecture's hut list (sources on each hut page).
When does booking open?
1 huts to stay at. Book with each hut (HutsGo takes no bookings).
- Enzanso Online booking closes the day before. P…
Map and elevation
Times split the official prefectural total (no breaks)
The line follows the GSI map footpaths. Trust the signposts on the day. Save GPX
High point 2,763m / Total ascent approx. 1,301m / 1,301m of climbing from Nakabusa Onsen trailhead (1,462m)
Hut (tap for details) Trailhead Point passed Elevation not confirmed
The horizontal axis is the order of the route, not time: we have not confirmed this route's leg times against an official source. The ridge line simply joins the recorded points, so it does not show the real shape of the terrain. Total ascent is an approximation summed between those points.


Stop by stop
Section times split the prefecture's official total course time across sections by path length, climb and descent.
-
1,462m
Nakabusa Onsen trailhead (中房温泉登山口)Trailhead
Three car parks. Full from early morning in peak season.
- approx. 3h35 up 1,324m down 33m
-
2,712m
Enzanso (燕山荘)Mountain hut / Enzanso Group
25 Apr – 22 Nov Also open over the New Year period Confirmed on the official site (2026-09-13)
Dinner + breakfast ¥16,000 No meals ¥11,000 Tent ¥2,000
- Water: Paid
- No charging
- Cash only
Booking opensOnline booking closes the day before. Private rooms open in stages from 1 April.
- approx. 50 min up 130m down 136m via Tsubakurodake 2,763m
-
2,712m
Enzanso (燕山荘) again on the way back ↑ details
- approx. 3h20 up 34m down 1,327m
-
1,462m
Nakabusa Onsen trailhead (中房温泉登山口)Trailhead
Three car parks. Full from early morning in peak season.