HutsGo

Japan › Northern Japan Alps

3 nights / 4 days / approx. 32.9 km / High point 2,870m

Jonen ridge: Nakabusa to Kamikochi

Nakabusa Onsen trailhead → Daitenso → Kamikochi

The parallel ridge: Tsubakuro, Otensho, Jonen and Chogatake, facing Yari and Hotaka the whole way, then down to Tokusawa.

How hard is it?

Strenuous.
Walkable path

Stamina 7 / 10Walking approx. 21h05

“2 nights or more is advisable”

Technical B

Steep ups and downs; hiking experience needed

Typical
3 nights / 4 days
Walking time
approx. 21h05estimated from distance, climb and descent; no breaks
Distance
approx. 32.9 km
Total climb
approx. 2,970m high point Daitenso 2,870m

Stamina and technical grades: Nagano Prefecture mountain grading, No.30 (our translation). Figures are for a similar route. HutsGo is still checking these against the table. See the table

How do I get there?

Reachable by Bus.
Start and finish are different

  1. Hotaka Station 穂高駅
  2. Nakabusa Onsen trailhead 1,462m
  3. Kamikochi Finish / no private cars

By car Three car parks. Full from early morning in peak season.

Times, fares and parking →

When are the huts open?

Open today (11/01): 5 of 5 huts

2026 season dates, from each hut's official site and Nagano Prefecture's hut list (sources on each hut page).

When does booking open?

5 huts to stay at. Book with each hut (HutsGo takes no bookings).

  • Enzanso Online booking closes the day before. P…
  • Daitenso Not confirmed
  • Jonen-goya One month before your stay (same date, … / unofficial
  • Chogatake Hutte 1 April, 10:00 JST. From 14 May, six we…
  • Tokusawaen Taking bookings for the whole season no… / unofficial
Pick your huts and plan the days

Map and elevation

Elevation profile of Jonen ridge: Nakabusa to Kamikochi. Horizontal axis is cumulative walking time, vertical axis is elevation.1,5002,0002,5003,000mNakabusa Onsen trailhead (中房温泉登山口) · 1,462m · 0 min from the start · TrailheadNakabusa Onsen trailhead 1,462mEnzanso (燕山荘) · 2,712m · 5h from the start · Hut (tap for details)Enzanso 2,712mDaitenso (大天荘) · 2,870m · 9h from the start · Hut (tap for details)Daitenso 2,870mJonen-goya (常念小屋) · 2,450m · 0 min from the start · Hut (tap for details)Jonen-goya 2,450mChogatake Hutte (蝶ヶ岳ヒュッテ) · Elevation not confirmed · 0 min from the start · Hut (tap for details)Chogatake Hutte Not confirmedTokusawaen (徳澤園) · 1,560m · 0 min from the start · Hut (tap for details)Tokusawaen 1,560mKamikochi (上高地) · 1,500m · 0 min from the start · TrailheadKamikochi 1,500m Elevation profile of Jonen ridge: Nakabusa to Kamikochi. Horizontal axis is cumulative walking time, vertical axis is elevation.1,5002,0002,5003,000mNakabusa Onsen trailhead (中房温泉登山口) · 1,462m · 0 min from the start · TrailheadNakabusa Onsen trailheadEnzanso (燕山荘) · 2,712m · 5h from the start · Hut (tap for details)EnzansoDaitenso (大天荘) · 2,870m · 9h from the start · Hut (tap for details)DaitensoJonen-goya (常念小屋) · 2,450m · 0 min from the start · Hut (tap for details)Jonen-goyaChogatake Hutte (蝶ヶ岳ヒュッテ) · Elevation not confirmed · 0 min from the start · Hut (tap for details)Chogatake Hutte Not confirmedTokusawaen (徳澤園) · 1,560m · 0 min from the start · Hut (tap for details)TokusawaenKamikochi (上高地) · 1,500m · 0 min from the start · TrailheadKamikochi

High point 2,870m / Total ascent approx. 1,408m / 1,408m of climbing from Nakabusa Onsen trailhead (1,462m)

Hut (tap for details) Trailhead Point passed Elevation not confirmed

The horizontal axis is the order of the route, not time: we have not confirmed this route's leg times against an official source. The ridge line simply joins the recorded points, so it does not show the real shape of the terrain. Total ascent is an approximation summed between those points. Chogatake Hutte have no confirmed elevation, so they are placed provisionally between the points either side.

Jonendake from Choyari
Jonendake from Choyari Photo: Alpsdake / CC0(Wikimedia Commons)
Chogatake Hutte and Yarigatake
Chogatake Hutte and Yarigatake Photo: Alpsdake / CC BY-SA 4.0(Wikimedia Commons)
Shows whether each hut is open that day

Stop by stop

Section times are estimates from the path length, climb and descent (a formula fitted to Nagano Prefecture's grading table; typically within about 10%).

  1. 1,462m

    Nakabusa Onsen trailhead (中房温泉登山口)Trailhead

    Three car parks. Full from early morning in peak season.

  2. approx. 4h20 up 1,324m down 33m
  3. 2,712m

    Enzanso (燕山荘)Mountain hut / Enzanso Group

    25 Apr – 22 Nov Also open over the New Year period Confirmed on the official site (2026-09-13)

    Dinner + breakfast ¥16,000 No meals ¥11,000 Tent ¥2,000

    • Water: Paid
    • No charging
    • Cash only

    Booking opensOnline booking closes the day before. Private rooms open in stages from 1 April.

  4. approx. 3h10 up 483m down 367m
  5. 2,870m

    Daitenso (大天荘)Mountain hut / Enzanso Group

    13 Jun – 3 Nov Confirmed on the official site (2026-09-13)

    Dinner + breakfast ¥16,000 No meals ¥11,000 Tent ¥2,000

    • Water: Free
    • Charging available
    • Cash only
  6. approx. 3h up 218m down 583m
  7. 2,450m

    Jonen-goya (常念小屋)Mountain hut

    27 Apr – 3 Nov Secondary source (as of 2026-09-13)

    Dinner + breakfast ¥16,000 No meals ¥11,000 Tent ¥2,000

    • Drying room

    Booking opensOne month before your stay (same date, previous month)

  8. approx. 4h45 up 829m down 640m
  9. Elevation not confirmed

    Chogatake Hutte (蝶ヶ岳ヒュッテ)Mountain hut / Chogatake Hutte

    25 Apr – 3 Nov Confirmed on the official site (2026-09-13)

    Dinner + breakfast ¥16,000 No meals ¥11,000 Tent ¥2,000

    • Water: Paid
    • Charging from ¥200
    • Cash only

    Booking opens1 April, 10:00 JST. From 14 May, six weeks ahead on the same weekday, 00:00 JST.

  10. approx. 3h40 up 34m down 1,115m
  11. 1,560mtopo map

    Tokusawaen (徳澤園)Lodge

    25 Apr – 3 Nov Secondary source (as of 2026-09-13)

    Dinner + breakfast ¥17,600+ No meals ¥11,000 Tent ¥2,000

    • QR payment
    • Bath

    Booking opensTaking bookings for the whole season now, by phone only

  12. approx. 2h10 up 79m down 95m
  13. 1,500m

    Kamikochi (上高地)Trailhead

    Closed to private cars all year. Bus or taxi from Sawando or Hirayu.

Questions

How long does Jonen ridge: Nakabusa to Kamikochi take?
3 nights / 4 days, approx. 21h05 of walking in total (no breaks).
Where does Jonen ridge: Nakabusa to Kamikochi start and finish?
Start at Nakabusa Onsen trailhead, finish at Kamikochi.
Where can I stay on Jonen ridge: Nakabusa to Kamikochi?
5 huts: Enzanso, Daitenso, Jonen-goya, Chogatake Hutte, Tokusawaen.
Can I reach Jonen ridge: Nakabusa to Kamikochi by public transport?
Yes (Bus).
How hard is Jonen ridge: Nakabusa to Kamikochi?
Stamina 7 / Technical B.

Answers are built from the facts on this page (each with its source and check date). Check the official site before you go.