HutsGo

Japan › Northern Japan Alps

2 nights / 3 days / approx. 39.4 km / High point 3,180m

Omote-Ginza traverse (Nakabusa to Yari to Kamikochi)

Nakabusa Onsen trailhead → Yarigatake → Kamikochi

The classic Northern Alps ridge line: up to Tsubakuro-dake, along to Daitenjo, the Higashi-Kama ridge to Yarigatake, then down the Yarisawa valley to Kamikochi.

How hard is it?

Strenuous.
Ladders and chains

Stamina 9 / 10Walking 25h18

“2–3 nights or more is advisable”

Technical C

Ladders and chains; a slip can mean a fall

Typical
2 nights / 3 days
Walking time
25h18walking only, no breaks
Distance
approx. 39.4 km
Total climb
approx. 3,070m high point Yarigatake 3,180m

Stamina and technical grades: Nagano Prefecture mountain grading, No.5 (our translation). HutsGo is still checking these against the table. See the table

How do I get there?

Reachable by Bus.
Start and finish are different

  1. Hotaka Station 穂高駅
  2. Nakabusa Onsen trailhead 1,462m
  3. Kamikochi Finish / no private cars

By car Three car parks. Full from early morning in peak season.

Times, fares and parking →

When are the huts open?

Open today (10/23): 3 of 6 huts

2026 season dates, from each hut's official site and Nagano Prefecture's hut list (sources on each hut page).

When does booking open?

6 huts to stay at. Book with each hut (HutsGo takes no bookings).

Pick your huts and plan the days

Map and elevation

Elevation profile of Omote-Ginza traverse (Nakabusa to Yari to Kamikochi). Horizontal axis is cumulative walking time, vertical axis is elevation.1,5002,0002,5003,000mNakabusa Onsen trailhead (中房温泉登山口) · 1,462m · 0 min from the start · TrailheadNakabusa Onsen trailhead 1,462mEnzanso (燕山荘) · 2,712m · 5h from the start · Hut (tap for details)Enzanso 2,712mDaitenso (大天荘) · 2,870m · 9h from the start · Hut (tap for details)Daitenso 2,870mOtensho Hutte (大天井ヒュッテ) · Elevation not confirmed · 9h30 from the start · Hut (tap for details)Otensho Hutte Not confirmedAkaiwadake (赤岩岳) · 2,769m · 10h40 from the start · Point passedAkaiwadake 2,769mHutte Nishidake (ヒュッテ西岳) · 2,680m · 11h30 from the start · Hut (tap for details)Hutte Nishidake 2,680mMamata-norikoshi (水俣乗越) · Elevation not confirmed · 12h10 from the start · Point passedMamata-norikoshi Not confirmedHutte Oyari (ヒュッテ大槍) · 2,884m · 13h from the start · Hut (tap for details)Hutte Oyari 2,884mYarigatake Sanso (槍ヶ岳山荘) · Elevation not confirmed · 14h from the start · Hut (tap for details)Yarigatake Sanso Not confirmedYarigatake (槍ヶ岳) · 3,180m · 14h30 from the start · Point passedYarigatake 3,180mYarisawa Lodge (槍沢ロッヂ) · Elevation not confirmed · 0 min from the startYarisawa Lodge Not confirmedYokoo Sanso (横尾山荘) · 1,620m · 0 min from the startYokoo Sanso 1,620mTokusawaen (徳澤園) · 1,560m · 0 min from the startTokusawaen 1,560mKamikochi (上高地) · 1,500m · 0 min from the start · TrailheadKamikochi 1,500m Elevation profile of Omote-Ginza traverse (Nakabusa to Yari to Kamikochi). Horizontal axis is cumulative walking time, vertical axis is elevation.1,5002,0002,5003,000mNakabusa Onsen trailhead (中房温泉登山口) · 1,462m · 0 min from the start · TrailheadNakabusa Onsen trailheadEnzanso (燕山荘) · 2,712m · 5h from the start · Hut (tap for details)EnzansoDaitenso (大天荘) · 2,870m · 9h from the start · Hut (tap for details)DaitensoOtensho Hutte (大天井ヒュッテ) · Elevation not confirmed · 9h30 from the start · Hut (tap for details)Otensho Hutte Not confirmedAkaiwadake (赤岩岳) · 2,769m · 10h40 from the start · Point passedAkaiwadakeHutte Nishidake (ヒュッテ西岳) · 2,680m · 11h30 from the start · Hut (tap for details)Hutte NishidakeMamata-norikoshi (水俣乗越) · Elevation not confirmed · 12h10 from the start · Point passedMamata-norikoshi Not confirmedHutte Oyari (ヒュッテ大槍) · 2,884m · 13h from the start · Hut (tap for details)Hutte OyariYarigatake Sanso (槍ヶ岳山荘) · Elevation not confirmed · 14h from the start · Hut (tap for details)Yarigatake Sanso Not confirmedYarigatake (槍ヶ岳) · 3,180m · 14h30 from the start · Point passedYarigatakeYarisawa Lodge (槍沢ロッヂ) · Elevation not confirmed · 0 min from the startYarisawa Lodge Not confirmedYokoo Sanso (横尾山荘) · 1,620m · 0 min from the startYokoo SansoTokusawaen (徳澤園) · 1,560m · 0 min from the startTokusawaenKamikochi (上高地) · 1,500m · 0 min from the start · TrailheadKamikochi

High point 3,180m / Total ascent approx. 1,908m / 1,718m of climbing from Nakabusa Onsen trailhead (1,462m)

Hut (tap for details) Trailhead Point passed Elevation not confirmed

The horizontal axis is the order of the route, not time: we have not confirmed this route's leg times against an official source. The ridge line simply joins the recorded points, so it does not show the real shape of the terrain. Total ascent is an approximation summed between those points. Otensho Hutte, Yarigatake Sanso, Yarisawa Lodge have no confirmed elevation, so they are placed provisionally between the points either side.

The granite ridge of Tsubakurodake
The granite ridge of Tsubakurodake Photo: Alpsdake / CC BY-SA 4.0(Wikimedia Commons)
The white granite ridge of Tsubakuro-dake with cloud on the green slopes
Tsubakuro-dake, just north of Enzanso, on white granite. Photo: HutsGo
Shows whether each hut is open that day

Stop by stop

Section times split the prefecture's official total course time across sections by path length, climb and descent.

  1. 1,462m

    Nakabusa Onsen trailhead (中房温泉登山口)Trailhead

    Three car parks. Full from early morning in peak season.

  2. approx. 4h30 up 1,324m down 33m
  3. 2,712m

    Enzanso (燕山荘)Mountain hut / Enzanso Group

    25 Apr – 22 Nov Also open over the New Year period Confirmed on the official site (2026-09-13)

    Dinner + breakfast ¥16,000 No meals ¥11,000 Tent ¥2,000

    • Water: Paid
    • No charging
    • Cash only

    Booking opensOnline booking closes the day before. Private rooms open in stages from 1 April.

  4. approx. 3h20 up 483m down 367m
  5. 2,870m

    Daitenso (大天荘)Mountain hut / Enzanso Group

    13 Jun – 3 Nov Confirmed on the official site (2026-09-13)

    Dinner + breakfast ¥16,000 No meals ¥11,000 Tent ¥2,000

    • Water: Free
    • Charging available
    • Cash only
  6. approx. 35 min up 5m down 179m
  7. Elevation not confirmed

    Otensho Hutte (大天井ヒュッテ)Mountain hut / Yarigatake Sanso Group

    11 Jul – 11 Oct Confirmed on the official site (2026-09-13)

    Dinner + breakfast ¥16,000 No meals ¥11,200

    • Toilet: Cartridge (flown out)
    • Charging available

    Booking opensOne month before your stay, 09:00 JST

  8. approx. 2h25 up 305m down 279m via Akaiwadake 2,769m
  9. 2,680m

    Hutte Nishidake (ヒュッテ西岳)Mountain hut / Enzanso Group

    10 Jul – 11 Oct Confirmed on the official site (2026-09-13)

    Dinner + breakfast ¥16,000 No meals ¥11,000 Tent ¥2,000

    • Water: Paid
    • No charging
    • Cash only
  10. approx. 2h35 up 488m down 299m via Mamata-norikoshi Elevation not confirmed
  11. 2,884m

    Hutte Oyari (ヒュッテ大槍)Mountain hut / Enzanso Group

    1 Jul – 12 Oct Confirmed on the official site (2026-09-13)

    Dinner + breakfast ¥16,000 No meals ¥11,000

    • No charging
    • Cash only

    Booking opensOnline booking closes at 07:00 JST on the day

  12. approx. 1h25 up 219m down 212m
  13. Elevation not confirmed

    Yarigatake Sanso (槍ヶ岳山荘)Mountain hut / Yarigatake Sanso Group

    27 Apr – 3 Nov Confirmed on the official site (2026-09-13)

    Dinner + breakfast ¥16,000 No meals ¥11,200 Tent ¥2,000

    • Toilet: Composting
    • Water: Paid
    • Charging from ¥100

    Booking opensOne month before your stay, 09:00 JST

  14. approx. 5h20 up 328m down 1,356m via Yarigatake 3,180m
  15. Elevation not confirmed

    Yarisawa Lodge (槍沢ロッヂ)Mountain hut / Yarigatake Sanso Group

    27 Apr – 3 Nov Confirmed on the official site (2026-09-13)

    Dinner + breakfast ¥16,000 No meals ¥11,200 Tent ¥2,000

    • Toilet: Composting
    • Water: Free
    • Charging from ¥100

    Booking opensOne month before your stay, 09:00 JST

  16. approx. 1h40 up 17m down 241m
  17. 1,620m

    Yokoo Sanso (横尾山荘)Mountain hut

    27 Apr – 3 Nov Closed for repairs 1-30 June Confirmed on the official site (2026-09-13)

    Dinner + breakfast ¥15,600 No meals ¥11,000 Tent ¥2,000

    • Charging available
    • Cards accepted
    • Bath

    Booking opensOne month before your stay, 07:00 JST, by phone. For 1 July - 25 Oct a limited number opens two months ahead via Yamatan.

  18. approx. 1h15 up 25m down 75m
  19. 1,560mtopo map

    Tokusawaen (徳澤園)Lodge

    25 Apr – 3 Nov Secondary source (as of 2026-09-13)

    Dinner + breakfast ¥17,600+ No meals ¥11,000 Tent ¥2,000

    • QR payment
    • Bath

    Booking opensTaking bookings for the whole season now, by phone only

  20. approx. 2h15 up 79m down 95m
  21. 1,500m

    Kamikochi (上高地)Trailhead

    Closed to private cars all year. Bus or taxi from Sawando or Hirayu.